Sam Sherwood-Hale spoke to Andre Dobraszczyk, Business Development Manager for Railways and Infrastructure at Thorlux Lighting, about compliance challenges, the role of controls, and why the company’s integrated approach is reshaping how the sector thinks about light.

SSH: How has your role at Thorlux evolved, and what does it involve today?

AD: I maintain consistency in the service we deliver, which is particularly important in a safety-critical environment. There are many standards unique to rail lighting, with some contradictions within them. I help customers navigate these, understand the requirements and how we can deliver solutions for them.

Thorlux has now moved into providing a full turnkey solution, including concept design, business case production, supply, and installation. Having the lighting manufacturer take the reins on the whole delivery adds value and removes risk. We also provide an innovative control system with supporting after-sales service to meet our customers’ needs, which are unique to the rail sector.

SSH: Can you speak more about those unique circumstances?

AD: Rail projects are shaped by a highly specific set of industry and British Standards, so lighting design in this environment requires careful coordination between compliance, operational requirements, and existing infrastructure.

One area currently evolving is Driver Controlled Operation (DCO), where lighting plays an important supporting role alongside CCTV and platform monitoring systems. We’re working with at least four railway operators to support the transition to driver-controlled trains, which are widely expected to be the future of railway operations.

For driver-controlled operations, there are very specific platform requirements. You have cameras working with lighting, transitions between dark and bright spaces. Some operators have cameras on the trains, some at the station, and some have both, and everything needs to work together. Lighting is a key part of that because it’s all about seeing people safely.

Platform environments also present unique design challenges. In addition to achieving the required lighting levels, installations must account for passenger information systems, signage, gantries, overhead electrification equipment, and other infrastructure elements that can affect light distribution and create shadows. Lighting must work around everything.

Another important consideration is that much of the UK rail estate was originally installed many years ago, often to earlier standards. As lighting standards evolve and stations are upgraded, operators are increasingly taking the opportunity to review both general and emergency lighting performance as part of wider improvement programmes. In many cases, achieving full compliance within existing infrastructure constraints requires innovative design approaches rather than simple one-for-one replacement.

Modern LED technology has significantly improved what can be achieved. For example, integrated emergency lighting solutions and intelligent controls can now provide enhanced safety performance on platforms without the need for extensive rewiring or major structural alterations. This allows operators to upgrade infrastructure more efficiently while supporting current operational and compliance objectives.

SSH: Is the compliance problem simply a case of constantly playing catch-up with new regulations?

AD: Yes, that is certainly a factor. Railway infrastructure is long-life by nature, and many lighting systems currently in service were originally designed to standards and operational requirements that have evolved over time.

Historically, maintaining lighting systems has often been classed as a maintenance intervention, with lighting swapped out on a point-for-point basis, including task and emergency lighting, to best match the previous performance of the lighting system. Across most railway premises, old incandescent and fluorescent lighting has been replaced with LED lighting, with or without controls, as a maintenance intervention. While this approach was practical and effective at the time, modern INTERVIEW standards and technologies now allow for a much more detailed assessment of lighting performance, uniformity, emergency provision, and energy efficiency.

Today, rail lighting projects generally involve more comprehensive design reviews, with full lighting calculations and approvals forming part of the process. This reflects the industry’s increasing focus on compliance, passenger experience, operational safety, and long-term asset performance.

One of the biggest advances has been in emergency lighting. Many open platforms were originally designed before modern emergency lighting expectations were established, and upgrading these areas using traditional technology would often have required significant rewiring or infrastructure changes. Advances in LED technology, battery systems, and intelligent controls now allow emergency lighting capability to be integrated into platform luminaires far more efficiently.

This has enabled operators and infrastructure managers to deliver upgrades in a more practical and cost-effective way while improving resilience and safety performance across the network.

SSH: So would solving these challenges have been more difficult ten years ago?

AD: Absolutely. Advances in LED performance, battery technology, and wireless controls have transformed what is now possible within existing rail infrastructure. Our approach has been driven by working closely with our customers, identifying the problems, then developing and trialling solutions in active stations.

Based on a risk assessment of a train evacuation, the train has battery-backed lights and large windows that illuminate the platform. But if there is no train present and the power fails at the station, you may have people standing on the platform or elsewhere who require lighting for safe evacuation. Once it is presented in those terms, everyone is keen to resolve it. We had to innovate our products because most column-mounted luminaires don’t have an emergency backup solution. We developed one for West Midlands Trains and the Wessex route that was tested and approved, and we now offer it to the whole sector.

SSH: The West Midlands Trains project was highly commended at the Rail Business Awards, and one figure I have is a 73 per cent drop in energy usage at Acocks Green station. Is energy reduction a big part of your offering?

AD: It is. Energy efficiency is a major driver behind modern rail lighting upgrades, alongside improved lighting performance, passenger safety, maintenance reduction, and operational resilience. Over the last several years, Thorlux has been involved in some of the UK’s largest station relighting programmes.

Our work in the sector began with trial installations at a small number of stations in 2017. This was followed by a major rollout with South Western Railway in 2019, involving the refurbishment of lighting across 187 stations during the challenges of Covid. This complete refurbishment involved the supply and installation of 17,523 Thorlux luminaires. I believe that was the largest single rollout project of its kind ever to happen in the UK.

West Midlands Trains are a significant customer with 150 stations. They completed platforms at 36 stations as part of their trial, then rolled out a complete lighting system across all 150 stations, completing in mid last year – approximately 15,000 luminaires.

Both projects demonstrated different but equally valuable approaches to improving station infrastructure. South Western Railway focused on delivering large-scale energy-efficient lighting upgrades across a substantial estate, while West Midlands Trains also embraced the additional operational and maintenance benefits offered by intelligent wireless controls.

SSH: How have different operators approached station lighting upgrades?

AD: Different operators naturally have different operational priorities, infrastructure challenges, and project objectives, so the scope of lighting upgrades can vary from network to network. Some projects have focused primarily on improving lighting performance and energy efficiency, while others have also 16 incorporated intelligent lighting controls to deliver additional operational and maintenance benefits.

For example, West Midlands Trains undertook an extensive upgrade programme across its network of 150 stations, incorporating LED lighting and wireless SmartScan lighting controls. That project began with trials at 36 stations using existing funding to qualify the benefits. They ran the system for two years, collected performance data from the SmartScan system, and then committed to a full rollout of LED luminaires with wireless lighting controls.

Lighting controls can significantly improve both energy and maintenance reduction. The SmartScan wireless lighting control system tells you precisely what the fault is, where it is, and what component needs replacing. The railway operator doesn’t need to visit the site; it monitors remotely daily, reporting faults, and testing the emergency lighting, so no one needs to go to the site to do this.

Rail is very heavy on cost. Maintaining the railway is expensive because of access requirements and the safety-critical nature of the work – sometimes you must stop the trains. Once you factor all of that in, the monetary reduction is huge, and there’s a significant environmental benefit too.

Thorlux has done business cases for more than 400 railway stations and delivered wireless lighting controls at over 200. Across those 200 stations, we have historic data on energy performance – how long a luminaire has been on, how much energy it’s using, and when it dims down.

In terms of figures, on some projects we’ve had to increase light levels by 500 per cent to meet current standards, and we are still making energy reductions. Typically, old lighting versus new without controls yields a 40 to 45 per cent lighting energy reduction. With controls, we see anything between 70 and 89 per cent lower lighting energy.

The 73 per cent saving at Acocks Green was the overall site energy reduction. It’s a small suburban station with 77 luminaires on site, and performance varies with occupancy. At a large station, lighting represents a significantly lower proportion of total site energy consumption because of heaters, buildings, and other systems.

SSH: Given how expensive energy is in the UK, this must be an area where cost savings are particularly impactful.

AD: Yes, and it’s an immediate saving. Pre-Covid, when energy costs were around ten pence per kilowatt hour, the return on investment for a full LED relighting with INTERVIEW a wireless lighting control system could be around five years. In an eight-year franchise, three years of net savings weren’t especially attractive. Now, everyone is looking at the whole-life picture, and the return on investment can be as low as two years due to current energy prices. From a business case point of view, it’s a bit of a no-brainer, but it all comes down to raising the funding and getting the project off the ground.

SSH: With the changing structure of the railways, are you optimistic that raising that funding will become easier?

AD: There are now several big drivers increasing investment in railway lighting. The first is Network Rail and the DfT’s carbon reduction target. Now that Network Rail has a net-zero target, lighting is a key part of meeting it, and it’s a quick win.

The second is compliance. Once operators realise they have a compliance issue, they need to fix it. They might have to wait twelve months or more for the funding, but they’re going to deal with it.

Third, building standards have changed. Part L now states that lighting needs controls: areas with daylight contribution need daylight dimming or switching, and areas not continuously occupied need occupancy switching.  Energy consumption on each lighting circuit must be metered, for example, by a lighting control system. Every large project should meet building regulations – that’s a legal requirement.

Finally, there’s the phase-out of old light sources. There are still many stations lit with incandescent lamps and fluorescent tubes. There was an EU and UK phase-out in 2023-4 under the Restriction of Hazardous Substances in Electrical and Electronic Equipment Directive (RoHS), which meant manufacturers could no longer produce them after a certain date. The stockpiles are now being exhausted. Operators are starting to realise this as they try to source these light sources and find they’re struggling, and prices are rising.

SSH: What is your sense of how things will change once operators are under Great British Railways?

AD: There will be a more structured approach to compliance. Things will be done correctly because they’ll go through a more structured system with proper approvals. It seems every station will now go through a landlord’s consent application, with a lighting design, an emergency lighting strategy, and a control strategy all required as part of the submission.

In terms of investment, there’ll be more money going into lighting, predominantly driven by business cases that have been building for a while, where operators have flagged non-compliances and said the works required are beyond their remit as tenants. Network Rail has a huge list it’s working through, but there’s at least a year to two years’ worth of planning to get those into motion.

There’s also a big push on BMS, building management systems. We’re working with two large operators who have obligations to install BMS systems at their sites. Technically, lighting with controls is a building management system in itself: lighting monitored off-site, with all performance data collected remotely.

The Thorlux SmartScan lighting control system is built into every luminaire, which communicates to create a wireless mesh network. This makes them easy to install without any rewiring. We take that data off-site via a gateway hub. We’ve now moved into integrating third-party BMS components into our lighting control system, carrying data on our wireless mesh network and displaying it all on our SmartScan portal.

Thorlux is also working on an innovation with a passenger information sign manufacturer who wants to use data from our lighting system. Our luminaires have sensors that can detect occupancy within a space. That information can trigger bespoke announcements – if a particular area of a platform is always congested, the system can detect that and send information to the PIS, which can tailor announcements to direct passengers or manage crowding. You could even use it for advertising.

Once you have a Thorlux system installed, you can add other systems and bring them all into one platform, producing reports that analyse the relationship between energy, occupancy, heating, and environmental factors. It’s not just a lighting system anymore; it’s becoming a building management analytics system.

SSH: Is all of that technology developed in-house?

AD: Yes. Being a UK manufacturer, with over 90 per cent of our products made in Redditch, gives us critical control over quality. We do everything we can in-house, right down to placing the LED on the circuit board, alongside metalwork, castings, plastics, and wiring.

Many of our railway customers want us to demonstrate that our products will last at least 25 years with a ten per cent failure rate and are fully maintainable throughout their operational life. That requires careful consideration of every component. We also manufacture our own controls to manage quality and control the pace of innovation. Ten years ago, our controls were quite basic; every five years, they’ve significantly developed, up to the BMS and analytics level we’re at now.

Many other manufacturers buy their controls from third-party companies, which creates two problems: you can’t innovate because you have no control over the technology, and if that manufacturer stops making the product, how do you maintain everything you’ve sold over the last 15 to 20 years? Because everything is in one factory in Redditch, I can walk in, speak to the designer and the manufacturing manager, and work out a solution very quickly. It’s all about innovation and quality – and not being at the mercy of the supply chain.

SSH: Thorlux has been carbon neutral since 2012 and has set a very ambitious net-zero target. How much do those credentials influence procurement decisions in rail today?

AD: Thorlux has always focused on energy reduction, and we applied the same thinking to our own operations. We’re selling an environmentally friendly product, so as a business, we need to be environmentally friendly. This also produces efficiencies and cost reductions! In 2009, we bought forest land and started planting trees to offset carbon production. All our roofs are solar-panelled, so much of our daytime energy usage is self-produced.

A lot of tenders now carry significant weighting on carbon neutrality and carbon reduction plans, looking at the whole life cycle: us, the supply chain, and the product. In lighting, we call it TM66: we produce a TM66 score showing how sustainable or ‘circular’ a product is. UK manufacturing has a huge benefit to that carbon story – if products are being shipped in by plane or boat, the credentials look completely different.

But it’s become a lot more prominent over the last few years. The targets are stricter, it’s more present in discussions, and is a key driver now. One of the key drivers of energy reduction is that the existing supply infrastructure is essentially at capacity: the government can’t afford to replace all the pylons and power stations, so reducing consumption becomes even more important. In all the tenders I’m working on now, it’s a hot topic.

SSH: Finally, where do you see the most significant opportunities for Thorlux in UK rail over the next few years?

AD: The rail sector is entering a period where long-delayed infrastructure upgrades are now becoming a priority, particularly with the phase-out of fluorescent lighting driving operators to modernise existing estates. That presents a significant opportunity for Thorlux, particularly in delivering energy-efficient lighting and intelligent controls across stations, depots, and operational facilities. Our rail business has grown significantly over the last decade, and we expect that momentum to continue over the next four to five years as more refurbishment programmes move forward.

Europe also represents a major opportunity. In many areas, the UK has led the way in adopting intelligent lighting technologies within railway environments, and there is strong potential to apply those lessons and innovations more widely across European rail networks.

Tunnels are another key growth area. We have been working closely with Network Rail and other partners on specialist tunnel lighting innovations, and we see subsurface infrastructure as an increasingly important sector. It is a highly technical environment with unique operational and maintenance challenges where robust, intelligent lighting solutions can deliver significant long-term benefits.

For general rail enquiries:

Email: rail@thorlux.co.uk

Tel:  01527 583 299

Web:  Thorlux Lighting United Kingdom