Founded in the 80s, BCM GRC Ltd has built a reputation of being the UK’s leading manufacturer of Glass-fibre Reinforced Concrete (GRC) and has become a popular choice for civil engineering solutions in the rail industry
GRC is one of the most versatile building materials available to architects and engineers. The extent of success and practical application in the rail industry can be illustrated by the fact that its lightweight (20 per cent the weight of precast concrete) and non-combustible (A1 fire classification).
British Rail incorporated the use of GRC for channel systems to protect cables and signalling equipment throughout the rail network in the late 80s. BCM GRC Ltd have continued to improve their channel system in line with industry requirements – now outlined in the framework agreement with Network Rail since the takeover.
GRC elevated cable channels (approved for use on Network Rail’s Infrastructure – PA05/00072) and ballast boards remain popular choices for the rail community. The system holds A1 fire classification, which is best in class. This has become a positive consideration in its use for many safetycritical applications (e.g. tunnel projects).
Transpennine Route Upgrade (TRU – West) is a standout project that has utilised the GRC channels in two tunnels (Standedge & Huddersfield) spanning a length of approximately 3,000 metres. With the composition of the material being ‘noncombustible’, the channels were favourable for these locations.
The manufacturing excellence of the business is due to the hard work of the highly experienced production team (based in Whitchurch, Shropshire) and UK based suppliers. As a result of this, reduced lead times can be achieved, with bespoke engineering solutions also available upon request.
Ferriby to Gilberdyke Resignalling
Network Rail were tasked with installing elevated channels on the Ferriby-Gilberdyke resignalling project. It was specified that the product must be lightweight, economical and easy to install. The ‘BCM GRC Ltd’ channel system was favoured as it met the above requirements.
The four-person team was able to install 100 metres in an eight-hour shift, installing the posts one day and GRC the next. Network Rail were very impressed with the product/ service provided and have since supplied contracts for the team at Huddersfield to Bradford, Doncaster, Morporth and Wymington amongst others.